Projects | Navitas System Integration

We have worked on LEED-certified commercial, residential, and institutional buildings with complex requirements.

Slider

PROJECTS

NSI has partnered with contractors and engineering firms on a variety of major construction projects with unique engineering and environmental challenges. Our work portfolio includes LEED-certified commercial, residential, and institutional buildings. We also have experience with projects that qualify for utility rebate funding.

BOSTON LANDING C1 CORE SHELL AND AUERBACH CENTER
BRIGHTON, MA

Square Footage:

Stories:

Completion date:

General Contactor:

Mechanical Contactor:

Engineer:

Owner:

275,000

6

2017

John Moriarty

Hamel & McAlister

BR+A

New Balance Development

Slider

Overview: This new construction will be prominently displayed along the Massachusetts Turnpike in the Boston Landing complex, providing 8,000 SF of dedicated first floor retail / restaurant space. The building will feature central services such as high-efficiency hot water heating and chilled water plants, 84,000 GSF of above-ground parking, spanning three levels, and two stories of shell space designated for laboratories. The top two floors will be utilized as a practice facility for the Boston Celtics, featuring two NBA regulation basketball courts, a locker room, hospitality space, kitchen facilities, offices, and common areas.

NSI Items: NSI is in the process of installing a completely integrated Building Automation system including high-end controls for the state of the art, mixed use athletic center

CAMBRIDGE CROSSING (NORTHPOINT PARCEL JK) CAMBRIDGE/SOMERVILLE, MA

Square Footage:

Stories:

Completion date:

General Contactor:

Mechanical Contactor:

Engineer:

Owner:

450,000

11

2019

John Moriarty

Limbach Inc.

BR+A

Divco West

Slider

Overview: This 450,000 square foot lab and office building overlooking the CX Common at the heart of Cambridge Crossing. Lab and tech space will be built to accommodate the Philips North America Innovation Center and leading science and technology tenants. The building includes 17,000 square feet of ground-level retail, three levels of underground parking, shared conference space, and a bike room equipped with lockers and an adjacent shower room. 250 North Street will be built to LEED V4 Silver sustainability specifications.

NSI Items: NSI is in the process of installing a completely integrated Building Automation system including high-end controls for the state of the art, Lab ready core and shell as well as all Tenant Improvement work for both office and lab use. NSI has installed a complete Siemens Building Automation platform including many Critical Environment controls. All Lab valves utilize the Siemens Venturi Air Valve devices and Fume Hood controls.

MASS INNOVATION LABS FITOUT (SMARTLABS) BRIGHTON, MA

Square Footage:

Stories:

Completion date:

General Contactor:

Mechanical Contactor:

Engineer:

Owner:

84,000

2

2019

Commodore

Walsh Mechanical

SMMA

Mass Innovation Labs (SmartLabs)

Slider

Overview: Leading biopharmaceutical industry accelerated commercialization program Mass Innovation Labs completed an 84,000 square feet fitout at The Auerbach Center, a 160,000-square-foot mixed-use building coming to the 15-acre Boston Landing development in Brighton. Mass Innovation Labs opened its’ new two-level space, aimed at accommodating cutting-edge biotech and technology companies looking for tailored space and operating programs. The company opened its’ first biotech incubator at 675 West Kendall Street in Kendall Square and recently leased 52,000 additional square feet at 21 Erie Street in Cambridge, which will open in May 2018, for a second biotech-geared space

NSI Items: NSI is in the process of installing a completely integrated Building Automation system including high-end controls for the state of the art, Lab ready core and shell as well as all Tenant Improvement work for both office and lab use. NSI has installed a complete Siemens Building Automation platform including many Critical Environment controls. All Lab valves utilize the Siemens Venturi Air Valve devices and Fume Hood controls.